Destecs

  • Increase font size
  • Default font size
  • Decrease font size

IFG Meeting 18 October 2010

PDF

The first meeting of the Industrial Follow Group has been organized at the office of Controllab Products in Enschede on the 18th of October. At this user group meeting the progress on the Destecs projects has been reported.

 

ifgmeeting

 

All members of the Industrial Follow Group have been asked to send in a challenge for the Destecs project. A challenge is a problem that can be evaluated using the tools and methods that have been built during the first year. The Destecs consortium will collect all challenges and choose at least 3 to be evaluated. For the evaluation about two manmonths of work will put into the challenge. No costs are involved for the challenge raisers. The goal of these challenges is to gain an evaluation of the potential benefits of deploying collaborative modelling and co-simulation in real industrial contexts. We hope that the challenges will show the effectiveness of the DESTECS methods and tools for a wider range of problems.

All the presentations and information on the challenge can be downloaded here:

Introduction to DESTECS

Co-simulation tool demo

Overview of the case studies

Invitation to IFG challenges

Last Updated on Thursday, 23 December 2010 09:42
 

Newsletter 2

PDF
The second Newsletter of the Destecs project has been released. Please click here to read the newsletter (pdf document).

newsletter2

 


Last Updated on Wednesday, 08 September 2010 09:17
 


Page 7 of 9

seventhframework

Project DESTECS 248134

Challenge 3.4: Embedded System Design